Commercial construction in Cortez, CO

Commercial construction for owners, developers and businesses in Cortez. Cortez is about 114 miles from our Moab office by US-191 south to Monticello, then US-491 east. Offices, banks, restaurants, retail and shops, taken from bare dirt to the final inspection on one contract.

One contract, one scheduleOwn carpentry and concrete crewsMoab based since 2011
Montezuma CountyCounty
6,181 ftElevation
1902Incorporated as a city
114 miFrom our Moab office

Ground up commercial in Cortez

A building, from bare dirt to the final inspection

Every commercial project in Cortez starts with a Colorado licensed design professional. The city requires one for all commercial plans, and the Building Division reviews those plans for code compliance before work starts. A commercial change of occupancy needs its own permit too, even when no walls move. The plans need enough detail to show they meet code, so a thin set costs time at the counter and a full set saves it.

Cortez trades on tourism and on being the place the region comes to shop, and Osprey Packs keeps its headquarters and more than 100 jobs here. Commercial owners in town range from visitor businesses on the highways to local retail. TWS Construction works out of Moab, as it has since 2011. On a Cortez job, the same team prices it and builds it, and our own carpenters and concrete hands build from the Colorado design professional's drawings.

Read more about commercial construction at TWS, or about building in Cortez.

Copper View two unit building in daylight

Local conditions

How a commercial permit moves through Cortez

Electrical is a state permit

Electrical work on a Cortez job is permitted by the State of Colorado, through the Department of Regulatory Compliance, not by the city. The plumber and the electrician on a commercial job must hold Colorado licenses.

Talk to the review team early

The city runs Advisory Review Team meetings to help developers move a project along. They are booked through Community and Economic Development at 970-565-3402, at City Hall, 123 Roger Smith Avenue.

A new Land Use Code

Cortez replaced its 1996 Land Use Code with a new one in April 2025. Under Chapter 6, an application or a talk with staff is generally needed for the first development of a parcel, a big change to a use or site plan, a subdivision, a conditional or temporary use, or a rezoning.

Fire inspections every year

The Building Division does the yearly fire inspections on commercial buildings in Cortez. Permits are required for all new structures, whatever their size or purpose, so even a small building on a commercial lot goes through the city.

What is included

What comes with the job

Site work, footings, slab and shell

Under the same contract as the rest of the building, so the foundation crew and the framing crew are working from one schedule.

Steel, framing and the building envelope

Framing is self-performed. The envelope, roofing and openings are managed by the same superintendent.

Interior build out and finishes

Walls, ceilings, doors and finishes, sequenced so inspections land in order and nothing is torn out to pass one.

Permits, inspections and close out

We handle the permit side, the inspection calendar and the close out documents, so the file is done when the building is.

Finished work

Recent TWS projects

Steel pergola with seating at Rancho Circle 49
Rancho Circle
Roof deck with chairs and views of the cliffs at Copper View
Copper View
Kane Creek Condominiums buildings seen from above
Kane Creek Condominiums
Copper View two unit building at dusk
Copper View
Rancho Circle 48 and its pool at dusk
Rancho Circle
Outdoor kitchen and hot tub at Copper View
Copper View
Open kitchen and living room at Rancho Circle 48
Rancho Circle
Kane Creek Condominiums front elevation below the red cliffs
Kane Creek Condominiums

Questions

Commercial construction in Cortez

Does a contractor need a city license to build in Cortez?
There is no city business license in Cortez at present. The city does license plumbers and gas fitters, and contractor approval is one step in the permit process, so ask the Building Division what it needs for your job.
What if my site is just outside Cortez city limits?
Unincorporated Montezuma County has no building department and does not issue certificates of occupancy, but commercial work there must still meet the 1997 Uniform Building Code or greater. The county also wants a county assigned 911 address, a driveway permit, and a state stormwater permit if you disturb an acre or more.
When can I reach the Cortez Building Division?
City Hall is open from 7:30 in the morning to 5 in the afternoon Monday through Thursday, and from 8 to noon on Friday. Inspections are requested on a 24 hour line at 970-564-4071.
Who issues the permit for this work in Cortez?
City of Cortez Building Division (Community & Economic Development). The city permits and inspects all phases except electrical (state permit). Commercial projects must be prepared by a Colorado licensed design professional; city does plan review; ART meetings available (970-565-3402). We handle the permit side for you.

Commercial construction in Cortez?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570