Home / Commercial construction / Monticello

Ground up commercial · Monticello, UT

Commercial construction in Monticello, UT

Commercial construction for owners, developers and businesses in Monticello. Monticello is about 54 miles from our Moab office by US-191 south. Offices, banks, restaurants, retail and shops, taken from bare dirt to the final inspection on one contract.

One contract, one scheduleOwn carpentry and concrete crewsMoab based since 2011
San Juan CountyCounty
7,069 ftElevation
1910Incorporated as a city
54 miFrom our Moab office

Ground up commercial in Monticello

A building, from bare dirt to the final inspection

Monticello is the San Juan County seat, and much of its commercial work follows from that. County offices sit at 117 South Main Street, the district court and a correctional facility are here, and San Juan Health has been building a replacement critical access hospital. Tourism is growing, and the town sits where US-191 meets US-491. Owners building offices, service buildings or shops here are building in the town that serves the whole county.

TWS Construction, based in Moab since 2011, works about 100 miles out, and Monticello falls well inside that. The same team that prices a Monticello building builds it. That keeps the number and the schedule with people who answer for both, from the first estimate to the final inspection.

Read more about commercial construction at TWS, or about building in Monticello.

Kane Creek Condominiums from above

Our work in Monticello

What TWS has already built in Monticello

JLL, building repair and upkeep in Monticello. See the projects.

Local conditions

Zoning and permit details for a commercial building in Monticello

Start with the right zone

Monticello has two commercial zones, C-1 and C-2, and an industrial zone, I-1. Land zoned G-1 for government is not open to private building. Permitted uses are listed in Title 10 of the City Code, and a zone change goes from the Building Official to the Planning Commission and then to a City Council vote.

What the application asks for

A Monticello permit application needs scaled plans, the legal description, the county parcel number, and a copy of the Utah license for each contractor on the job. The Building Official can also require drawings carrying the stamp of a Utah-licensed architect or engineer. Having all of it ready at submittal keeps the review moving.

Portal and office hours

Applications go through the city's iWorQ online permit portal. The city office at 17 N 100 E is open 8:00 to 4:30 Monday through Thursday and 8:00 to noon on Friday. With a half day on Friday, plan meetings and inspection calls for earlier in the week.

A code set by the state

Utah sets its building code statewide. Utah Code 15A-2-103 adopts the 2024 International Building Code, in both the version in effect July 1, 2026 and the one set for January 1, 2027. Commercial drawings for Monticello should be drawn to that edition.

What is included

What comes with the job

Site work, footings, slab and shell

Under the same contract as the rest of the building, so the foundation crew and the framing crew are working from one schedule.

Steel, framing and the building envelope

Framing is self-performed. The envelope, roofing and openings are managed by the same superintendent.

Interior build out and finishes

Walls, ceilings, doors and finishes, sequenced so inspections land in order and nothing is torn out to pass one.

Permits, inspections and close out

We handle the permit side, the inspection calendar and the close out documents, so the file is done when the building is.

Finished work

Recent TWS projects

Front of Rancho Circle 49 at dusk
Rancho Circle
Roof deck with views of the cliffs at Copper View
Copper View
Pool, spa and fire pit at dusk at Rancho Circle 48
Rancho Circle
Covered patio at Copper View at dusk
Copper View
Sunken fire pit and pool at Rancho Circle 48
Rancho Circle
Dining and living area with an open stair at Copper View
Copper View
Covered upper deck overlooking the pool at Rancho Circle 48
Rancho Circle
Kitchen with a long island at Rancho Circle 49
Rancho Circle

Questions

Commercial construction in Monticello

Can a business owner act as their own general contractor on a commercial building in Monticello?
No. The city states that the owner of a commercial project cannot act as their own contractor in Utah, and commercial work must use licensed contractors. A general contractor also brings the license copies the application asks for.
Are Monticello's land use rules changing?
They are under review. The city Planning Commission's August 18, 2026 agenda included a draft 2027 General Plan, a Land Use Element, a Moderate Income Housing Element and a Building Permit Update. Before a commercial design is final, check the zoning and permit rules in force that month.
What happens if work starts before a Monticello permit is issued?
The city adds an investigation fee equal to the permit fee, set in its Consolidated Fee Schedule. On a commercial building, that doubles the permit cost. Waiting for the permit is the cheaper path.
Who issues the permit for this work in Monticello?
City of Monticello Building Official. The Building Official issues permits. Permits are required for new construction, additions, remodels and demolition. We handle the permit side for you.

Commercial construction in Monticello?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid