Home / Sitework, concrete and utilities / Monticello

Sitework, concrete and utilities · Monticello, UT

Sitework and concrete in Monticello, UT

Excavation, utilities and concrete in Monticello. Monticello is about 54 miles from our Moab office by US-191 south. Excavation, grading, wet utilities, footings, slabs and flatwork.

Own concrete crewsExcavation and wet utilitiesADA ramps and flatwork
San Juan CountyCounty
7,069 ftElevation
1910Incorporated as a city
54 miFrom our Moab office

Sitework, concrete and utilities in Monticello

The part nobody sees, done by people we employ

Sitework in Monticello happens at the foot of the Abajo Mountains, at about 7,000 feet. The October 22 to 23, 2026 storm brought nearly five inches of rain in 48 hours to some parts of the area. Then on November 1, heavy rain north of town flooded parts of the area. Grading, drainage, utility trenches and pour dates in Monticello all need to be planned around water coming off the high ground.

Our concrete hands are TWS employees, working out of the Moab office we have run since 2011. In Monticello that matters most in spring and fall, when a pour date depends on the weather and on having a crew ready when the window opens. Excavation, utilities and concrete sit on one schedule under one superintendent, and the project manager who priced the dirt work stays on the job.

Read more about sitework, concrete and utilities at TWS, or about building in Monticello.

TWS crew setting a concrete manhole in a deep red dirt trench

Local conditions

Ground, water and weather on a Monticello site

Drainage built for real storms

During the November 1, 2026 rain, evacuations were underway for residences downstream from Loyds Lake. Loyds Lake is also one of the sources for the city's water. Culverts, swales and storm drains on a Monticello site should be sized with storms like that one in mind.

Cold-weather pours

Monticello averages about 64 inches of snow a year. Concrete placed in the cold needs protection, heat or a later date, and the schedule has to allow for it. Our own concrete crew sets those pour dates, so they move with the forecast instead of a sub's calendar.

Demolition and moved buildings need permits

Monticello requires a building permit before demolition and before moving a trailer or pre-built home onto a lot, not only for new construction. Clearing an old structure off a site is permitted work, so the permit goes on the schedule ahead of the excavator.

Utility projects outside city limits

Outside the city, the San Juan County Planning Commission reviews conditional use permits for utility and energy work. Its 2025 agendas included a Questar Gas regulator station, a solar project and a temporary weather tower. Each meeting also has a building permit review item.

What is included

What comes with the job

Excavation, grading and trenching

Site prep, building pads and utility trenches.

Water, sewer and storm

Wet utilities and the structures that go with them.

Footings, foundations and slabs

Formed and poured by our own concrete crews.

Flatwork, curb and ADA ramps

Sidewalks, approaches, curb and ramps built to the spec.

Finished work

Recent TWS projects

Kitchen with a long waterfall island at Copper View
Copper View
Finished turf yard with chairs at El Rancho
El Rancho, start to finish
Hot tub and outdoor kitchen at dusk at Copper View
Copper View
Steel pergola with seating at Rancho Circle 49
Rancho Circle
Roof deck with chairs and views of the cliffs at Copper View
Copper View
Kane Creek Condominiums buildings seen from above
Kane Creek Condominiums
Copper View two unit building at dusk
Copper View
Rancho Circle 48 and its pool at dusk
Rancho Circle

Questions

Sitework and concrete in Monticello

Where does the design snow load for a Monticello site come from?
From the USU Utah Ground Snow Load map, which gives 50-year values for an exact set of coordinates. Utah's 2024 building code uses ASCE 7-22 values. At this elevation, the number should come from that map for the actual site, not from a job in Moab.
What water system will a new Monticello connection tie into?
City water comes from Blue Mountain Springs on the Abajo Mountains, a mix of springs and intakes at North Creek, Bank Head, Pole Canyon, Gold Queen and Loyds Lake. In 2022 the system drew about 270,000 gallons a day for about 2,000 customers. It is treated with mixed media filtration and chlorine.
Where can I check a Monticello lot's zoning before site work?
The city links an online property zoning map from its building and zoning page, and setbacks are published in the city code. Setbacks decide where the pad, parking and utility runs can go, so they belong on the site plan before grading.
Who issues the permit for this work in Monticello?
City of Monticello Building Official. The Building Official issues permits. Permits are required for new construction, additions, remodels and demolition. We handle the permit side for you.

Sitework and concrete in Monticello?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid