Home / Sitework, concrete and utilities / Spanish Valley

Sitework, concrete and utilities · Spanish Valley, UT

Sitework and concrete in Spanish Valley, UT

Excavation, utilities and concrete in Spanish Valley. Spanish Valley is about 7 miles from our Moab office by US-191 south. Excavation, grading, wet utilities, footings, slabs and flatwork.

Own concrete crewsExcavation and wet utilitiesADA ramps and flatwork
Grand and San Juan CountyCounty
5,131 ftElevation
7 miFrom our Moab office

Sitework, concrete and utilities in Spanish Valley

The part nobody sees, done by people we employ

Sitework in Spanish Valley starts below the surface. The valley formed when a buried ridge of salt collapsed, and the Utah Geological Survey says the ground can hold gypsum, sulfates and soil that drops when it gets wet. Its detailed hazard map stops at the north end of the valley. Farther south, a separate state geologic map notes slow, ongoing sinking along Mill and Pack Creeks and more risk of slope movement at the valley edges.

TWS Construction has been based in Moab since 2011, and our concrete crew works for us, not for a sub. On Spanish Valley ground, that means the crew forming footings and pouring slabs works to the soils report and the floodplain rules on one schedule we control. We price excavation, utilities and concrete together, with a project manager on the numbers and a superintendent on the site.

Read more about sitework, concrete and utilities at TWS, or about building in Spanish Valley.

Crew compacting a utility trench on a TWS site

Local conditions

Soils, water and floodplain rules under a Spanish Valley site

Protect the concrete

The Utah Geological Survey reports gypsum-rich, corrosive soil and rock in the Moab and north Spanish Valley area, and it notes that sulfates can break down unprotected building materials. A soils report should set the concrete mix and how footings and slabs are protected. That decision belongs before the first pour.

Where gypsum is high, move water away

Where gypsum makes up more than 10 percent of the soil, the survey says it can dissolve and cause sinking and sinkholes. Its advice is to send surface water away from buildings, limit landscape watering and consider sealed pipes. That shapes the grading plan, the roof drain outlets and how utility joints are built.

Floodplain inspections

For Grand County parcels, a commercial site in the flood hazard area gets three floodplain inspections during the job, plus a final floodplain check before the Certificate of Occupancy. A surveyor's elevation certificate is needed before and after building, so pad heights and grading have to be right the first time.

Groundwater close to the surface

In the state hazard study that covers Moab and the north end of the valley, the survey mapped places where groundwater may sit less than 10 feet down, and it rates those areas high for flood hazard. Deep utility trenches and footings there should be planned for water.

What is included

What comes with the job

Excavation, grading and trenching

Site prep, building pads and utility trenches.

Water, sewer and storm

Wet utilities and the structures that go with them.

Footings, foundations and slabs

Formed and poured by our own concrete crews.

Flatwork, curb and ADA ramps

Sidewalks, approaches, curb and ramps built to the spec.

Finished work

Recent TWS projects

Covered patio at Copper View at dusk
Copper View
Sunken fire pit and pool at Rancho Circle 48
Rancho Circle
Dining and living area with an open stair at Copper View
Copper View
Covered upper deck overlooking the pool at Rancho Circle 48
Rancho Circle
Kitchen with a long island at Rancho Circle 49
Rancho Circle
Media wall with lit niches and a linear fireplace at Copper View
Copper View
Living room with a media wall and linear fireplace at Rancho Circle 48
Rancho Circle
Kitchen with a long waterfall island at Copper View
Copper View

Questions

Sitework and concrete in Spanish Valley

Do we need a geotechnical report for a Spanish Valley site?
Yes. The Utah Geological Survey says collapsible soil calls for a site-specific study at every location, and its detailed hazard map covers only the north end of the valley. A soils report before design is the surest way to pick the right footing.
What frost depth do footings need in Spanish Valley?
On Grand County parcels, the county's design criteria give a 20 inch frost depth and a 21 psf ground snow load, but only for sites under 5,000 feet. Above that line the county points you to its Building Department or the USU snow load map, and parts of the valley sit higher: the Census place of Spanish Valley is about 5,131 feet. We get the number for the exact site before footings are drawn.
Who provides power for temporary service on a Spanish Valley job?
Grand County's commercial checklist names Rocky Mountain Power. The county needs a Rocky Mountain Power work order number before it will inspect temporary or permanent power, so that request should go in early.
Who issues the permit for this work in Spanish Valley?
Depends on the parcel: Grand County Building Department, or San Juan County Planning & Building Department. Grand County Building Department (59 N 200 E, Moab, 435-259-4134) covers Grand County and says it does not do building work for adjacent San Juan County land, which goes to the San Juan Building Department (117 S Main St, Monticello, 435-587-3829, permits@sanjuancountyut.gov). The Census place is in San Juan County. We handle the permit side for you.

Sitework and concrete in Spanish Valley?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid