Home / Sitework, concrete and utilities / Green River
Sitework, concrete and utilities · Green River, UT
Sitework and concrete in Green River, UT
Excavation, utilities and concrete in Green River. Green River is about 52 miles from our Moab office by US-191 north to I-70, then I-70 west. Excavation, grading, wet utilities, footings, slabs and flatwork.
Sitework, concrete and utilities in Green River
The part nobody sees, done by people we employ
Sitework in Green River starts with the river. Updated FEMA flood maps would push the flood zone out to almost three times its old area, pulling in land between Green River Boulevard and the canal by Acerson's. The city has asked for a closer study, which staff think will take between five and seven years. Until then, staff advise against changing zoning in the newly mapped areas. A pad, a parking lot or a utility trench near the river should be planned with both maps in hand.
The weather is the other half of the job. Green River gets about 7.6 inches of precipitation a year, and its records run from 113 F down to minus 25 F. Concrete is poured by TWS Construction's own crews, out of Moab, where the company has been based since 2011. The same team that prices the site work builds it, and we schedule pours for the weather instead of waiting on a sub's calendar.
Read more about sitework, concrete and utilities at TWS, or about building in Green River.

Local conditions
Flood maps, the river corridor and hookups in Green River
The 2012 close call
Staff say the river has stayed in its banks since the upstream reservoir started controlling the flow. The 2012 high water still got close, and the city had to do emergency work on the old riverbank. Grading and drainage near the river should be built for a year like that.
A protected river corridor
The city's Drinking Water Source Protection Plan covers a quarter mile on each side of the Green River and 15 miles upstream of the water intake. The planning commission is looking at an overlay zone for that corridor and rules such as detention ponds for large parking lots, so leave room for one on the site plan.
Water and sewer hookups
The city takes its own water and sewer connection applications and charges water and sewer impact fees. Ask for those fees early so they land in the site budget instead of in a change order.
Heat and cold on the pour
With summer highs that have reached 113 F, hot weather pours need early starts and careful curing. Winter lows that have hit minus 25 F mean blankets or heat for any concrete placed in the cold months.
What is included
What comes with the job
Excavation, grading and trenching
Site prep, building pads and utility trenches.
Water, sewer and storm
Wet utilities and the structures that go with them.
Footings, foundations and slabs
Formed and poured by our own concrete crews.
Flatwork, curb and ADA ramps
Sidewalks, approaches, curb and ramps built to the spec.
Finished work
Recent TWS projects








Questions
Sitework and concrete in Green River
Is my Green River site in the new flood zone?
Will a big parking lot in Green River need a detention pond?
Is wildfire a site issue in Green River?
Who issues the permit for this work in Green River?
More in Green River
Other work we do in Green River
Commercial construction in Green River
Commercial construction for owners, developers and businesses in Green River.
Public and municipal construction in Green River
Public work for the agencies and school districts that serve Green River.
Multi-family construction
Multi-family and mixed use construction in Southeastern Utah.
Tenant improvements
Commercial tenant improvements and interior build outs in Southeastern Utah.
Preconstruction and estimating
Cost estimating, value engineering and schedules for commercial and public projects in Southeastern Utah.
Sitework and concrete in Green River?
Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.
Or call or text (435) 200-5570