Home / Sitework, concrete and utilities / Green River

Sitework, concrete and utilities · Green River, UT

Sitework and concrete in Green River, UT

Excavation, utilities and concrete in Green River. Green River is about 52 miles from our Moab office by US-191 north to I-70, then I-70 west. Excavation, grading, wet utilities, footings, slabs and flatwork.

Own concrete crewsExcavation and wet utilitiesADA ramps and flatwork
Emery CountyCounty
4,078 ftElevation
1906Incorporated as a city
52 miFrom our Moab office

Sitework, concrete and utilities in Green River

The part nobody sees, done by people we employ

Sitework in Green River starts with the river. Updated FEMA flood maps would push the flood zone out to almost three times its old area, pulling in land between Green River Boulevard and the canal by Acerson's. The city has asked for a closer study, which staff think will take between five and seven years. Until then, staff advise against changing zoning in the newly mapped areas. A pad, a parking lot or a utility trench near the river should be planned with both maps in hand.

The weather is the other half of the job. Green River gets about 7.6 inches of precipitation a year, and its records run from 113 F down to minus 25 F. Concrete is poured by TWS Construction's own crews, out of Moab, where the company has been based since 2011. The same team that prices the site work builds it, and we schedule pours for the weather instead of waiting on a sub's calendar.

Read more about sitework, concrete and utilities at TWS, or about building in Green River.

Finished concrete pool deck at Rancho Circle 48

Local conditions

Flood maps, the river corridor and hookups in Green River

The 2012 close call

Staff say the river has stayed in its banks since the upstream reservoir started controlling the flow. The 2012 high water still got close, and the city had to do emergency work on the old riverbank. Grading and drainage near the river should be built for a year like that.

A protected river corridor

The city's Drinking Water Source Protection Plan covers a quarter mile on each side of the Green River and 15 miles upstream of the water intake. The planning commission is looking at an overlay zone for that corridor and rules such as detention ponds for large parking lots, so leave room for one on the site plan.

Water and sewer hookups

The city takes its own water and sewer connection applications and charges water and sewer impact fees. Ask for those fees early so they land in the site budget instead of in a change order.

Heat and cold on the pour

With summer highs that have reached 113 F, hot weather pours need early starts and careful curing. Winter lows that have hit minus 25 F mean blankets or heat for any concrete placed in the cold months.

What is included

What comes with the job

Excavation, grading and trenching

Site prep, building pads and utility trenches.

Water, sewer and storm

Wet utilities and the structures that go with them.

Footings, foundations and slabs

Formed and poured by our own concrete crews.

Flatwork, curb and ADA ramps

Sidewalks, approaches, curb and ramps built to the spec.

Finished work

Recent TWS projects

Roof deck with views of the cliffs at Copper View
Copper View
Pool, spa and fire pit at dusk at Rancho Circle 48
Rancho Circle
Covered patio at Copper View at dusk
Copper View
Sunken fire pit and pool at Rancho Circle 48
Rancho Circle
Dining and living area with an open stair at Copper View
Copper View
Covered upper deck overlooking the pool at Rancho Circle 48
Rancho Circle
Kitchen with a long island at Rancho Circle 49
Rancho Circle
Media wall with lit niches and a linear fireplace at Copper View
Copper View

Questions

Sitework and concrete in Green River

Is my Green River site in the new flood zone?
It may be if it sits between Green River Boulevard and the canal by Acerson's, where the updated FEMA maps grow the most. The city asked for a detailed elevation study before it changes zoning there. Check both the current map and the proposed one before you set a finished floor height.
Will a big parking lot in Green River need a detention pond?
Possibly, if it falls inside the quarter mile river corridor. The planning commission named detention ponds for large parking lots as one of the near term steps under the drinking water plan it approved in June 2026.
Is wildfire a site issue in Green River?
Not inside city limits so far. The city is reviewing the state wildland urban interface map under House Bill 48, and no high risk wildland fire zones were identified within city limits.
Who issues the permit for this work in Green River?
Emery County Building & Zoning (building permits); City of Green River (zoning clearances, business licenses). The city's services page says building permit applications go through Emery County Building & Zoning, (435) 381-3555. City planning minutes show the city handles zoning clearances and business licenses and has no fire inspector yet (June 2026). We handle the permit side for you.

Sitework and concrete in Green River?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid