Home / Public and municipal construction / Green River

Public and municipal · Green River, UT

Public and municipal construction in Green River, UT

Public work for the agencies and school districts that serve Green River. Green River is about 52 miles from our Moab office by US-191 north to I-70, then I-70 west. Sidewalks, curb and ADA ramps, school and facility remodels, and site improvements for cities, counties and school districts.

City of Moab sidewalk contractHelen M. Knight Elementary remodelSubmittals and pay apps handled
Emery CountyCounty
4,078 ftElevation
1906Incorporated as a city
52 miFrom our Moab office

Public and municipal in Green River

Public work lives or dies on the paperwork

Public work in Green River comes from a short list of owners. The city runs water, sewer, streets, parks, the cemetery, solid waste and the municipal airport through its Public Works department. Emery County School District runs Green River High School, and its board met in town in May 2026 at 255 South Solomon Street. Each owner posts its work in a different place, and each tends to pay for it with outside money.

Public owners are a core part of the work at TWS Construction, a Moab company since 2011. The City of Moab picked TWS for its 2025 Sidewalk Construction Project, and our crews finished the Helen M. Knight Elementary remodel that reached from the pipes in the ground to a playground with shade structures. In Green River, recent public jobs have leaned on grants and federal funds, so the wage rules, material rules and reports that come with that money matter as much as the concrete.

Read more about public and municipal construction at TWS, or about building in Green River.

Helen M. Knight Elementary school sign

Local conditions

Who builds public work in Green River, and how it gets paid for

The water plant job

The City of Green River put out an Invitation for Bids on new GAC filters for its water treatment plant in 2024. The plant upgrade was listed at $600,000 with federal money behind it, which brought Davis Bacon wages, Build America Buy America rules and a 5% bid bond.

School courts on a grant

In May 2026 the Emery County School District awarded new tennis and pickleball courts at Green River High on the lowest qualifying bid, $1,184,236. A Small District Rural Athletic grant paid for part of it, and a state safety grant under HB61 covered a backup generator.

Summer is school building season

The same board plan listed summer roofing at Green River High and new carpet at Bookcliff. School work here has to fit the months when students are out, so crews and materials need to be lined up before the last day of school.

Where the bids show up

The city posts its bids on the RFQs and Bids page of its website. School board actions, including contract awards, are posted as public notices on the state's public notice website.

What is included

What comes with the job

Sidewalk, curb, gutter and ADA ramps

Our own concrete crews do the flatwork, so the pour schedule is ours to keep.

School and facility remodels

Phased around the calendar the agency gives us, from site work and utilities to interiors.

Site improvements and playgrounds

Grading, utilities, concrete and the finished surface, on the school job down to the shade structures.

Traffic control, submittals and pay applications

The documents a public owner audits, kept current as the work moves, not rebuilt at the end.

Finished work

Recent TWS projects

Open kitchen and living room at Rancho Circle 48
Rancho Circle
Kane Creek Condominiums front elevation below the red cliffs
Kane Creek Condominiums
Pool and spa at Rancho Circle 49 at dusk
Rancho Circle
Kitchen with waterfall island at Copper View
Copper View
Front of Rancho Circle 49 at dusk
Rancho Circle
Roof deck with views of the cliffs at Copper View
Copper View
Pool, spa and fire pit at dusk at Rancho Circle 48
Rancho Circle
Covered patio at Copper View at dusk
Copper View

Questions

Public and municipal construction in Green River

Which public agencies build in Green River?
The City of Green River, through Public Works and the city owned Green River Municipal Airport, and the Emery County School District, which runs Green River High School. The Utah Inland Port Authority also oversees the Castle Country project area, which covers parts of town.
Does federal money change a public job in Green River?
It can. The city's 2024 water plant upgrade carried Davis Bacon wage rules and Build America Buy America terms because it was federally funded. We price to the wage and material rules written into the bid documents.
Can TWS work around the Green River High School calendar?
Yes. The district does work like the 2026 roofing at Green River High over the summer, and we plan crews and materials around the dates the district sets. On our Helen M. Knight Elementary remodel, the scope covered underground utilities, finished rooms inside and the play area outside.
Who issues the permit for this work in Green River?
Emery County Building & Zoning (building permits); City of Green River (zoning clearances, business licenses). The city's services page says building permit applications go through Emery County Building & Zoning, (435) 381-3555. City planning minutes show the city handles zoning clearances and business licenses and has no fire inspector yet (June 2026). We handle the permit side for you.

Public and municipal construction in Green River?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid