Home / Service areas / Moab

Commercial general contractor · Moab, UT

General Contractor in Moab, UT

TWS Construction is based in Moab. Commercial, public, multi-family and sitework, with our own carpentry and concrete crews.

Moab based since 2011Own carpentry and concrete crewsPublic and private work
Grand CountyCounty
4,026 ftElevation
1902Incorporated as a city
400 EastOur office is here

Our work in Moab

What TWS has already built in Moab

Helen M. Knight Elementary, the school remodel, from the utilities in the ground to the new playground; Desert Rivers Credit Union, commercial work for the credit union; Kane Creek Condominiums, condominium buildings below the red cliffs. See the projects.

Finished playground at Helen M. Knight Elementary in Moab
Desert Rivers Credit Union in Moab
Kane Creek Condominiums in Moab

Building in Moab

What it takes to build in Moab

Moab sits at about 4,026 feet elevation in Grand County and was incorporated in 1902. Moab is a city of about 5,400 people and the seat of Grand County. The city sits at about 4,026 feet above sea level. The City of Moab Building Official issues city building permits, and plan review checks zoning, floodplain, engineering, public works and wastewater. Moab's zoning rules are in Title 17 of the city code, and commercial projects must follow landscaping and design standards. Mill Creek flooded downtown on August 20, 2022, and the creek rose about 11.6 feet in about an hour. Projects near Mill Creek may need a floodplain permit under Chapter 15.40 of the city code.

The Utah Geological Survey says the valley soils are often salty and can hold gypsum, which is weak under a building. The same survey says some valley soils collapse or swell, so site tests are advised for every project. Water here comes from wells and springs, and city leaders have been looking at how much water the aquifer can supply. Moab built a new wastewater plant in 2019 that can treat 1.75 million gallons a day.

A finished building by TWS Construction

Permits and approvals

Who you deal with to build in Moab

Who issues the permit

City of Moab Building Safety / Building Inspection (Building Official), under Planning & Zoning. Building Official reviews and issues city building permits. Apply through the City of Moab Portal or send plans to permitting@moabcity.gov.

Land use and zoning

City of Moab Planning & Zoning (Community Development), Planning Commission and City Council. City says all development is governed by Titles 12, 15, 16 and 17 of the Moab Municipal Code. Title 15 is building and construction (includes Chapter 15.40 Flood Damage Prevention), Title 16 is subdivisions, Title 17 is zoning (C-3 Central Commercial is Chapter 17.24, Definitions are 17.06, FW Floodway Zone is 17.33).

City of Moab (Engineering, Public Works, Utilities)

City RFP 26-03 (March 2026) directed proposals to utah.bonfirehub.com. Oct 2025 council minutes show 300 South bridge replacement at 30 percent design and a proposed city water tank on Spanish Trail Drive.

Grand County (Clerk/Auditor, Building Department)

Arroyo Crossing Phase II infrastructure bid (roads, sewer, water, electrical, irrigation, storm drain for about 116 affordable housing units near 2022 S Spanish Valley Drive) closed Oct 24, 2025 and was posted on the Utah Public Notice site. Federal labor rules (Davis-Bacon) applied.

The ground and the weather

What the site itself will ask of the job

The ground

Utah Geological Survey says the Moab quadrangle covers the city and the northern Moab-Spanish Valley, a northwest to southeast graben formed when a salt anticline collapsed.

The ground

UGS says surface and near-surface soils and rocks in the valley are commonly salt-rich and highly soluble. Added water from landscape irrigation and poor runoff management raises the hazard from soluble soils and other problem soils.

Water and weather

On Aug 20, 2022 two Spanish Valley rain gauges recorded 1.42 and 1.71 inches in about an hour. Mill Creek in Moab rose about 11.6 ft in about one hour, and mud covered much of downtown from 200 N to 300 S (National Weather Service).

Water and weather

Moab Sun News reported a Mill Creek gage peak of 15.65 ft, an estimated 5,000 cfs against a normal flow near 10 cfs, and overtopping of the 300 South and Main Street bridges. The city has 11 vehicle bridges and 7 pedestrian bridges, and none were lost.

The town

The places and the economy that shape the work

Tourism is a main industry. Moab draws visitors to Arches and Canyonlands national parks, plus mountain biking and off-roading. It grew from agriculture and then mining (uranium, vanadium, potash, manganese, oil and gas).

The Department of Energy has moved 17 million tons of uranium mill tailings by rail to Crescent Junction, about 30 miles away (article dated Sept 29, 2026). Soil under and beside the old pile still has to be removed.

Margaret L. Hopkin Middle School is a 110,000 sq ft replacement school built on the same site as the old one.

Main Street (US-191 through town)Mill Creek and Mill Creek ParkwayKane Creek Boulevard400 East, 100 West, 300 South and 500 West bridges over Mill CreekEast Center Street (City Hall at 217 East Center)Williams Way (Moab Regional Hospital)Spanish Valley DriveWalnut Lane and Mill Creek DriveCourthouse Wash, Grandstaff Canyon, Pritchett Canyon, Pack Creek

Finished work

Recent TWS projects

Kitchen with waterfall island at Copper View
Copper View
Front of Rancho Circle 49 at dusk
Rancho Circle
Roof deck with views of the cliffs at Copper View
Copper View
Pool, spa and fire pit at dusk at Rancho Circle 48
Rancho Circle
Covered patio at Copper View at dusk
Copper View
Sunken fire pit and pool at Rancho Circle 48
Rancho Circle
Dining and living area with an open stair at Copper View
Copper View
Covered upper deck overlooking the pool at Rancho Circle 48
Rancho Circle

Questions

Building in Moab

Does TWS Construction work in Moab?
Yes. Our office is at 285 S 400 E, Moab, UT 84532, so Moab jobs are minutes away. We work about a hundred miles out from Moab, across Southeastern Utah and the Four Corners. Send the documents or a scope and you will get a straight answer on whether we are bidding.
Who issues building permits in Moab?
City of Moab Building Safety / Building Inspection (Building Official), under Planning & Zoning. Building Official reviews and issues city building permits. Apply through the City of Moab Portal or send plans to permitting@moabcity.gov. We handle the permit side of the job for you.
What does TWS build in Moab?
Commercial buildings, public and municipal work, multi-family, tenant improvements, sitework, concrete and utilities, and preconstruction and estimating. Carpentry and concrete are done by our own crews.

Building something in Moab?

A set of bid documents, a drawing, or a scope written on the back of something. Start with one conversation.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid