Preconstruction and estimating in Moab, UT
Budgets, estimates and schedules for projects in Moab. Our office is at 285 S 400 E, Moab, UT 84532, so Moab jobs are minutes away. Cost estimating, value engineering and schedules you can hand to a board or a lender.
Preconstruction and estimating in Moab
Find the expensive problems while they are still on paper
Preconstruction in Moab starts with a question that sounds simple: is the parcel inside city limits? Inside the city, Moab lists the 2024 International Building Code with Utah amendments and the commercial provisions of the 2024 IECC. Grand County's design criteria page lists the 2021 editions of both. A lot just outside town can be priced against a different code book, so we settle that first. We have worked from a Moab office since 2011, and the people who price a job also build it.
Next come the loads. Grand County publishes design criteria for sites under 5,000 feet, and Moab's elevation is roughly 4,026 feet. The county lists a 21 psf ground snow load, 115 mph wind at Exposure C and a winter design temperature of 8 degrees. Those figures drive roof framing, connections and insulation, so they go into the first budget, and we check them against the city's own requirements before the number is final.
Read more about preconstruction and estimating at TWS, or about building in Moab.

Local conditions
The numbers a Moab estimate starts from
Grading is in the code
Moab adopted the 2024 IBC with Appendix J, the appendix that covers grading. Cut, fill, slopes and drainage are part of what the city can review, not only the building. We price earthwork to that standard from the first estimate.
Flood map panels
The city posts FIRM panels 49019C1754D, 1758D, 1759D, 1766D and 1767E, along with a Flood Insurance Study. A lot inside a mapped flood zone adds a floodplain permit and can change the design. We look up the panel before we price the site, because that is cheapest to know on day one.
The 180 day start clock
Moab's permit process says construction must start within 180 days of the permit being issued. If financing, bids or materials are not lined up, the permit can lapse before the first footing. We build the schedule back from that date.
Frost depth and footings
Grand County's criteria put frost depth at 20 inches for sites under 5,000 feet, with an air freezing index of 850. Footings go below that line or use a frost-protected design. That depth drives the excavation and concrete quantities in a Moab estimate.
What is included
What comes with the job
Cost estimating and budget reporting
A real number for the scope as drawn, and a clear list of what is and is not in it.
Value engineering
Alternates priced out, so the owner chooses with the numbers in front of them.
Schedules
CPM schedules and work in progress reports you can hand to a board or a lender.
Delivery method advice
Hard bid, design build or construction management, whichever the project calls for.
Finished work
Recent TWS projects








Questions
Preconstruction and estimating in Moab
Can you give us a Moab budget before drawings are done?
How much rain should a Moab project be ready for?
Who besides the building office reviews a Moab project?
Who issues the permit for this work in Moab?
More in Moab
Other work we do in Moab
Commercial construction in Moab
Commercial construction for owners, developers and businesses in Moab.
Public and municipal construction in Moab
Public work for the agencies and school districts that serve Moab.
Multi-family construction in Moab
Duplexes, townhomes and mixed use in Moab.
Tenant improvements in Moab
Interior build outs and remodels for businesses in Moab.
Sitework and concrete in Moab
Excavation, utilities and concrete in Moab.
Preconstruction and estimating in Moab?
Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.
Or call or text (435) 200-5570