Home / Preconstruction and estimating / Moab

Preconstruction and estimating · Moab, UT

Preconstruction and estimating in Moab, UT

Budgets, estimates and schedules for projects in Moab. Our office is at 285 S 400 E, Moab, UT 84532, so Moab jobs are minutes away. Cost estimating, value engineering and schedules you can hand to a board or a lender.

Same team prices and buildsAlternates priced outLocal lead times, not a database
Grand CountyCounty
4,026 ftElevation
1902Incorporated as a city
400 EastOur office is here

Preconstruction and estimating in Moab

Find the expensive problems while they are still on paper

Preconstruction in Moab starts with a question that sounds simple: is the parcel inside city limits? Inside the city, Moab lists the 2024 International Building Code with Utah amendments and the commercial provisions of the 2024 IECC. Grand County's design criteria page lists the 2021 editions of both. A lot just outside town can be priced against a different code book, so we settle that first. We have worked from a Moab office since 2011, and the people who price a job also build it.

Next come the loads. Grand County publishes design criteria for sites under 5,000 feet, and Moab's elevation is roughly 4,026 feet. The county lists a 21 psf ground snow load, 115 mph wind at Exposure C and a winter design temperature of 8 degrees. Those figures drive roof framing, connections and insulation, so they go into the first budget, and we check them against the city's own requirements before the number is final.

Read more about preconstruction and estimating at TWS, or about building in Moab.

Garages framed at El Rancho

Local conditions

The numbers a Moab estimate starts from

Grading is in the code

Moab adopted the 2024 IBC with Appendix J, the appendix that covers grading. Cut, fill, slopes and drainage are part of what the city can review, not only the building. We price earthwork to that standard from the first estimate.

Flood map panels

The city posts FIRM panels 49019C1754D, 1758D, 1759D, 1766D and 1767E, along with a Flood Insurance Study. A lot inside a mapped flood zone adds a floodplain permit and can change the design. We look up the panel before we price the site, because that is cheapest to know on day one.

The 180 day start clock

Moab's permit process says construction must start within 180 days of the permit being issued. If financing, bids or materials are not lined up, the permit can lapse before the first footing. We build the schedule back from that date.

Frost depth and footings

Grand County's criteria put frost depth at 20 inches for sites under 5,000 feet, with an air freezing index of 850. Footings go below that line or use a frost-protected design. That depth drives the excavation and concrete quantities in a Moab estimate.

What is included

What comes with the job

Cost estimating and budget reporting

A real number for the scope as drawn, and a clear list of what is and is not in it.

Value engineering

Alternates priced out, so the owner chooses with the numbers in front of them.

Schedules

CPM schedules and work in progress reports you can hand to a board or a lender.

Delivery method advice

Hard bid, design build or construction management, whichever the project calls for.

Finished work

Recent TWS projects

Covered upper deck overlooking the pool at Rancho Circle 48
Rancho Circle
Kitchen with a long island at Rancho Circle 49
Rancho Circle
Media wall with lit niches and a linear fireplace at Copper View
Copper View
Living room with a media wall and linear fireplace at Rancho Circle 48
Rancho Circle
Kitchen with a long waterfall island at Copper View
Copper View
Finished turf yard with chairs at El Rancho
El Rancho, start to finish
Hot tub and outdoor kitchen at dusk at Copper View
Copper View
Steel pergola with seating at Rancho Circle 49
Rancho Circle

Questions

Preconstruction and estimating in Moab

Can you give us a Moab budget before drawings are done?
In most cases, yes. From a scope and a site address we can price the site, the structure and the local rules that move cost, such as Grand County's design loads and the city's flood maps. The number tightens as drawings come in, and the same team carries it into the build.
How much rain should a Moab project be ready for?
Moab's wettest year on record was 1983, with 16.42 inches, and on July 23 of that year 2.77 inches fell in a single day. Storms like that are why we price drainage and storm water with the site work, before the building, instead of leaving it as an allowance.
Who besides the building office reviews a Moab project?
The city's permit flow chart gives separate contacts for zoning, engineering, public works, city utilities, the fire district and the county health office, plus the valley water and sewer agency, GWSSA, on parcels it serves. Each can add a requirement that costs money. We list which ones touch the project at the start of the estimate.
Who issues the permit for this work in Moab?
City of Moab Building Safety / Building Inspection (Building Official), under Planning & Zoning. Building Official reviews and issues city building permits. Apply through the City of Moab Portal or send plans to permitting@moabcity.gov. We handle the permit side for you.

Nearby

Preconstruction and estimating in nearby towns

Preconstruction and estimating in Moab?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid