Home / Sitework, concrete and utilities / Blanding

Sitework, concrete and utilities · Blanding, UT

Sitework and concrete in Blanding, UT

Excavation, utilities and concrete in Blanding. Blanding is about 75 miles from our Moab office by US-191 south. Excavation, grading, wet utilities, footings, slabs and flatwork.

Own concrete crewsExcavation and wet utilitiesADA ramps and flatwork
San Juan CountyCounty
6,099 ftElevation
75 miFrom our Moab office

Sitework, concrete and utilities in Blanding

The part nobody sees, done by people we employ

The upland soil around Blanding, at about 6,100 feet, was laid down by wind. The soil series named for the area is very deep and formed from sandstone material carried by the wind, with carbonate buildup starting 9 to 30 inches down. Thin loess like it covers uplands across the southeastern Colorado Plateau. On top of that ground, the city itself runs the main utilities a new site connects to, so sitework here is both a soils job and a city coordination job.

TWS Construction has worked from Moab since 2011 with its own concrete crew on payroll. On a Blanding site we run excavation, utility trenches and concrete on one schedule. A superintendent calls inspections in order, and the project manager who set the price answers for it. That counts in a town where the city reviews the street cut, the utility tap and the sidewalk.

Read more about sitework, concrete and utilities at TWS, or about building in Blanding.

Crew compacting a utility trench on a TWS site

Local conditions

Digging, connecting and pouring in Blanding

Street cuts need a city application

Any work that cuts into a Blanding city street needs a Street Cut Application, and the city's forms also include a Sidewalk Agreement. Utility taps under the road and new walks along the lot get planned with the city before the saw comes out.

One owner for every line

Blanding City provides electricity, natural gas, water, sewer and stormwater itself. Every trench on a new site ties into a city system, which is why Public Works is part of the first review and stays in the loop through the final connection.

Sizing for big storms

In the storm of October 22 and 23, 2026, the town took 4.37 inches of rain. That is about a third of the 12.89 inches the town gets in an average year, in two days. Site grading and storm drains here should be checked against a storm that size.

Water for the job

The city's June 2026 report put the water year at 79 percent of the 30-year average, with the third reservoir 58 percent full and the fourth 89 percent full. Water for dust control and compaction is worth planning with the city early.

What is included

What comes with the job

Excavation, grading and trenching

Site prep, building pads and utility trenches.

Water, sewer and storm

Wet utilities and the structures that go with them.

Footings, foundations and slabs

Formed and poured by our own concrete crews.

Flatwork, curb and ADA ramps

Sidewalks, approaches, curb and ramps built to the spec.

Finished work

Recent TWS projects

Kitchen with a long island at Rancho Circle 49
Rancho Circle
Media wall with lit niches and a linear fireplace at Copper View
Copper View
Living room with a media wall and linear fireplace at Rancho Circle 48
Rancho Circle
Kitchen with a long waterfall island at Copper View
Copper View
Finished turf yard with chairs at El Rancho
El Rancho, start to finish
Hot tub and outdoor kitchen at dusk at Copper View
Copper View
Steel pergola with seating at Rancho Circle 49
Rancho Circle
Roof deck with chairs and views of the cliffs at Copper View
Copper View

Questions

Sitework and concrete in Blanding

What does the Blanding soil series mean for footings?
The series describes very deep, wind-deposited soil on slopes of 2 to 10 percent, with its type location about 6.5 miles south of town. It is a map unit, not a test result. A site soils report decides the footing design.
How cold does Blanding get for concrete work?
Blanding has recorded 23 degrees below zero, and it averages about 38 inches of snow a year. Cold-weather pours need protection and a schedule that allows for it. Our own crew sets those pour dates.
Who do we talk to about utility taps in Blanding?
Start with the city offices at 50 West 100 South, 435-678-2791, where Community Development Director Ben Muhlestein's office handles building. New construction also needs the city's utility service request form before a tap is made.
Who issues the permit for this work in Blanding?
Blanding City (building permits through the City Inspect online system). A permit is required for new homes and for structural, electrical, plumbing or mechanical changes. Applications, plan review and inspection requests run through City Inspect, and contractors must create an account. We handle the permit side for you.

Sitework and concrete in Blanding?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid