Home / Multi-family construction / Spanish Valley

Multi-family and mixed use · Spanish Valley, UT

Multi-family construction in Spanish Valley, UT

Duplexes, townhomes and mixed use in Spanish Valley. Spanish Valley is about 7 miles from our Moab office by US-191 south. Duplexes, townhomes and mixed use for owners who are looking at a return, not a dream home.

Duplexes and townhomesValue engineering before contractOwn framing crews
Grand and San Juan CountyCounty
5,131 ftElevation
7 miFrom our Moab office

Multi-family and mixed use in Spanish Valley

Units built to a cost per door that pencils

Grand County has already bid the roads, water, sewer and storm drainage for Arroyo Crossing Phase II, about 116 affordable homes on about 4.8 acres near Spanish Valley Drive. It is one sign of where housing south of Moab is going. Before a duplex, townhome or apartment plan goes far here, three answers decide it: which county the lot is in, what the zone allows, and which agency will serve the units with water and sewer.

TWS Construction has been a Moab company since 2011. Spanish Valley is a short run down US-191 from our office. Our own carpenters frame the units and our own concrete crew pours the footings and slabs. That counts on multi-family work, because the same unit plan repeats and one crew learns it once. The project manager who prices the job stays with it, working with our superintendents until the last unit passes inspection.

Read more about multi-family construction at TWS, or about building in Spanish Valley.

Copper View two unit building with glass garage doors

Our work in Spanish Valley

What TWS has already built in Spanish Valley

Copper View, two unit buildings with covered patios, outdoor kitchens and roof decks, built from bare lot to finished rooms. See the projects.

Copper View two unit building in Spanish Valley at dusk
Garages framed at the Copper View site in Spanish Valley
Finished kitchen at Copper View in Spanish Valley

Local conditions

Getting multi-family units approved and served in Spanish Valley

Site plan review comes first

Grand County's commercial checklist covers multi-family too. A multi-family project needs a completed Site Plan Review with Planning and Zoning before the building permit moves. Then it needs sign-offs from Moab Valley Fire, the Health Department and the Grand Water and Sewer Service Agency.

Lot sizes on the Grand County side

A June 2026 Grand County staff report on a rezone near Zimmerman Lane and the Blu Vista Subdivision worked with two zones: Rural Residential, with one acre minimum lots, and Large Lot Residential, with half acre lots. More units than a zone allows means asking for a map change, which the county weighs against the 2024 Spanish Valley Future Land Use Plan.

The SVR zone and public sewer

In the San Juan County part of the valley, the Spanish Valley Residential (SVR) zone ties new plats to public water and sewer. County staff told a plat applicant in that zone to connect through the Spanish Valley Special Service District. That makes the district's capacity part of the first conversation, not the last.

Federal money brings wage rules

The Arroyo Crossing Phase II bid was paid for in part with federal Community Development Block Grant money and carried federal labor standards, including Davis-Bacon wages. Rules like these change the labor number on every unit. We price them straight from the bid documents.

What is included

What comes with the job

Duplexes, townhomes and small multi-family

Ground up, from site work and utilities to the final inspection on each unit.

Mixed use

Commercial space on the street with units above or behind, on one contract.

Value engineering before the contract

Alternates priced out so you choose with the numbers in front of you.

Repeatable unit layouts

Built in a sequence the crews can repeat, so the schedule and the cost per door hold.

Finished work

Recent TWS projects

Pool and spa at Rancho Circle 49 at dusk
Rancho Circle
Kitchen with waterfall island at Copper View
Copper View
Front of Rancho Circle 49 at dusk
Rancho Circle
Roof deck with views of the cliffs at Copper View
Copper View
Pool, spa and fire pit at dusk at Rancho Circle 48
Rancho Circle
Covered patio at Copper View at dusk
Copper View
Sunken fire pit and pool at Rancho Circle 48
Rancho Circle
Dining and living area with an open stair at Copper View
Copper View

Questions

Multi-family construction in Spanish Valley

Who provides water and sewer for a multi-family project in Spanish Valley?
That turns on which side of the county line the lot is on. The Grand Water and Sewer Service Agency, formed in 1999 from three local districts, provides culinary water, irrigation water and wastewater collection. On the San Juan side, the San Juan Spanish Valley Special Service District runs water and sewer, and its sewer lines connect to the City of Moab regional treatment plant.
Where does Spanish Valley's water come from?
In 2023 the Grand Water and Sewer Service Agency drew from six wells and from Mill Creek through the Sheley Tunnel, with three tanks and storage at Ken's Lake. The San Juan district had one well and one tank. The wells pull from the valley-fill aquifer and the deeper Glen Canyon Group aquifer.
How much state trust land is in south Spanish Valley?
As of 2017, the School and Institutional Trust Lands Administration managed more than 8,000 acres in the south end of the valley, about 5,200 of them in San Juan County. Any multi-family plan on that land still goes through the zoning on its side of the county line.
Who issues the permit for this work in Spanish Valley?
Depends on the parcel: Grand County Building Department, or San Juan County Planning & Building Department. Grand County Building Department (59 N 200 E, Moab, 435-259-4134) covers Grand County and says it does not do building work for adjacent San Juan County land, which goes to the San Juan Building Department (117 S Main St, Monticello, 435-587-3829, permits@sanjuancountyut.gov). The Census place is in San Juan County. We handle the permit side for you.

Nearby

Multi-family construction in nearby towns

Multi-family construction in Spanish Valley?

Send the bid documents, a drawing, or a scope and a site address. You will get a straight answer on whether we are bidding.

Or call or text (435) 200-5570
Call or text (435) 200-5570 Invite us to bid